Ask The Expert

ESU Preventive Maintenance

Performing preventive maintenance on your ESU prevents future emergency maintenance and can help to save lives. Make sure your ESU device is up to date and working properly with these tips below.

Thu Sep 13 2018By Rigel Medical

We recently connected with National Business Development Manager at Rigel Medical, Jack Barrett, on signs that an ESU is due for PM. Curious about the tips you see here or want to know what the experts think? Fill out the form at the bottom of the page to ask Jack Barrett directly.

What are signs that an ESU item is due for a PM?
The PM schedule is determined by the facility via their internal processes.  Manufacturer's recommendations  provide necessary input to developing that process.

Could anything happen to equipment if a PM is not preformed on time? What are the risks?
An ESU PM deals with both low frequency electrical safety and actual generator performance, e.g., power outputs.   The concern really drives down to the patient and hospital personnel.  From an electrical safety perspective, if touch currents are beyond specification, there is the danger of electrical shock.  From a performance perspective, there is a very real danger of unnecessary patient tissue damage and burns.  In the OR during a procedure, should a surgical tool fail, HF leakage current could cause harm, burns that is, to both the patient and possible the OR staff.

What are common mistakes that are made while preforming preventive maintenance on an ESU?
Not testing specific aspects, like HF leakage current testing or other manufacturer suggested tests. There is a concern from some generator manufactures on the actual impedance of the load bank.  There is a tendency to look at a power load bank as simple DC resistance.  When in actuality, at generator PWM frequencies, any inductance and/or capacitance in the load bank will influence test results.  If using separate power resistors for power output testing, doing so on a conductive ESD mat.

Are there extra safety measurements that must be taken for an ESU PM that differ from usual PMs?

Extra care is to become part of the test circuit which would result in burns to the individual preforming the testing.

Which testing devices do you recommend to be used during PM on an ESU?
Certainly an electrical safety analyzer is needed.  Other accessories such as foot switch adapters and test pencils help speed up the PM process.

What other tips do you have to help with preforming your own PM on an ESU?
I have seen many do their electrical safety test after completing their performance testing.  My suggestion is always do electrical safety first.  It may be rare occurrence, but you want to ensure touch current is not excessive prior to handling the generator.


To learn more about Rigel Medical, go here.



This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Please review our Privacy Policy for more details.
I Agree