Steelco - EW 2 2S - 3S
by Steelco

Follow Us
DESCRIPTION
Synchronous reprocessing capacity of 2 or 3 flexible endoscopes: single door and double door pass-through versions.

[list]              [b]Unrivalled reprocess capacity[/b]              EW 2 2S: up to 2 endoscopes - up to 9 videobronchoscopes per batch              EW 2 3S: up to 3 endoscopes - up to 6 videobronchoscopes per batch                            [b]Best capacity/footprint ratio[/b]              sliding down doors & frontal maintenance                            [b]Lowest cost per batch [/b]              reduced water and chemical consumption                                          Steelco EW 2 2S and EW 2 3S are dedicated to low temperature washing and high level disinfection of flexible endoscopes it has been devoleped for treatment of all types and model.                            The new Steelco EW 2 2S and EW 2 3S AERs fully comply with the ISO 15883-1/5 directives and incorporates all the latest innovative technologies.                            Can be supplied in a pass-through interlocked double door version, or single door.                            Complete cleaning and disinfection cycle time in 25 minutes only.                            Ergonomic and effortless general operation              EW 2 2S and EW 2 3S AERs are equipped with sliding drawers that allow the easy instruments loading and unloading operations.                            Single hand operated instrument/AER connection              [/list]

FORUMSView All
Ask a New Question
DOCUMENTS / MANUALSView All

FEATURES

[list]              [*] Compatible and tested with peracetic acid (cold disinfection) and glutaraldehyde (chemo-thermal)              [*] User and instrument recognition through bar code reading system or RIFD (Radio Frequency Identification).              [*] Leak test at the beginning of the cycle and continuous monitoring during all cycle phases with automatic cycle stop in case of anomaly.              [*] Precise endoscope channel-check (up to 7 channels for each endoscope ) with two independent monitoring systems through pressure and flow measurement and data logging during the whole cycle.              [*] Disinfection of all the water used in the process with a two stage high level water filtering (0,5 Μm and 0,1 Μm filters) for endotoxin removal.              [*] Integrated sterile air filter for channel leak test, purging and drying.              [*] Self thermal disinfection cycle at 90°C as required from the UNI EN ISO 15883-4 rule including endoscope basket and connections.              [*] Data logging of all program data and instrument parameters, graphically visualized as a curve.              [*] Complete documentation on integrated printer or to PC/hospital server with SteelcoData software.              [*] Large color LCD touch screen display for easy machine operation and endoscope/operator database management              [/list]

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Please review our Privacy Policy for more details.
I Agree