- All Categories
- Surgical
- Anesthesia Equipment
- Aspirator
- Autotransfusion Unit
- Biopsy
- Blood Warmer
- Corneal Topography System
- Cryosurgical Units
- Diathermy Unit
- Electrosurgical Unit (ESU)
- Endoscopy
- Fluid Management Systems
- Image-Guided Surgery System
- Lesion Generator
- Microscope-Surgical
- Patient Positioners
- Phacoemulsification Unit
- Radiosurgery
- Smoke Evacuation System
- Surgical Head Lights
- Surgical Light
- Surgical Slush Machines
- Surgical Table
- Tourniquets
- Waste Management System
Waste Management System Forums
Add Waste Management System to My Bench44 Results
Updated Feb 22 2023
2 RepliesI have a Neptune Rover 3 that works perfectly fine to empty the tank however when we go to use it and plug it into AC power we have no power or functionality. RE: Stryker - Neptune 3
Added Jun 18 2022
0 RepliesPlanning for new build and looking to find out how much detergent is used per wash cycle to establish inventory par levels. Anyone know? RE: Stryker - Neptune 3
Updated Feb 8 2022
Updated Feb 3 2022
2 Replies
Hi The unit was not used for last 10 months due to Covid-19. Switched on today and wash cycle done. No suction and Showing 1.6 , 1.7 Memory error and 12.4 temp.error .. Please help to resolve this issue
Updated Feb 11 2021
3 RepliesWhen using the smoke evacuator can you suction fluid into the filter with the smoke? RE: Stryker - Neptune 3
Added Feb 7 2021
0 RepliesI am an architect trying to ensure we have enough space for the Stryker Neptune 3. I have numerous pdf's but none have plan dimensions of the unit and the docking station. RE: Stryker - Neptune 3
Updated Jan 4 2021
7 RepliesError clears once docked, out of dock unit works well until throwing the code again in the middle of use. Anyone run into the same thing? RE: Stryker - Neptune 3
0 Replies
We are consultant for the system design to the Dornoch ultra Evac model UL-EV100. Could you please help the question below. 1. The drain from this equipment will direct to connect to the drainage system or will be indirectly connect to the hospital drainage system. 2. Th2 water to this equipment will be hard pipe connection or it will through a 3/4" hose to connect to the equipment. My email is wanli.cong@wsp.com
RE: Zimmer - Dornoch Ultra EvacUpdated Aug 28 2020
2 RepliesI am in need of the Styker Neptune 2 service and information on the recommended PM Kit.
Thanks RE: Stryker - Neptune 2
Added May 5 2020