Mon Aug 30 2021

Connection / Synchronization ( ARGON)

Hi to all, We have these 2 systems ERBE - APC 300 and ERBE - ICC300, connected together as requested. Both systems have their own Foot Pedal Switches ( Yellow and Blue ) . In order for the to work with the ARGON we have to press in parallel the blue foot switch from APC 300 and the blue foot switch from ICC300. Do you know how we can operate it just doing it only from one pedal ? Thanks in Advance

   RE: Electrosurgical Unit (ESU) Report Post
Tue Aug 31 2021Reply from Ben C
Ben C

RPI may be able to assist. 


Find me on FacebookLinkedIn, YouTube or Twitter 
 

Report Post
Sun Sep 05 2021Reply from Periwinkle
Periwinkle

Hey,

 

This is simple and we can assist you with a diagram and with written instructions.

Here is a brief and we can discuss further on emails/call.

 

1) Take out two wires from Blue pedal of Erbe ICC300 and two wires from Blue pedal of APC300.

 

2) Take a seperate (third) single pedal foot switch. Connect the two wires from ICC300 in parallel + two wires from APC 300 in parallel. Connect them and you're reday to go.

(On a seperate note, we can provide a single pedal footswitch)

 

 

I hope this helps. Happy to discuss further in detail.

 

 

Kind Regards,

Periwinkle Kaur

+1 (437) 777-8450 (Whatsapp)

info.dcadsinternational@gmail.com


Dr Periwinkle Kaur CMgr
Direcor, ESU Medical Solutions Ltd
www.esumedical.co.uk
sales@esumedical.co.uk

Report Post
Tue Sep 28 2021Reply from pityooka
avatar placemark

You will need a connecting cable from APC to ICC, it is a short 20cm cable.4-pin/one side male ,other side female


Report Post
Tue Sep 28 2021Reply from pityooka
avatar placemark

Erbe code 20189-022


Report Post
Tue Jul 19 2022Reply from JITu
avatar placemark

You need connecting cable


Report Post

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Please review our Privacy Policy for more details.
I Agree